Homepage » News » March 2010

The national consultations within the framework of the Aral Sea Basin program elaboration (ASBP-3) for the period of 2011-2015 took place in the Kyrgyz Republic on the 26th of March.

The EC IFAS chairman Saghit Ibatullin made presentation of the Aral problems as a topic for the Seventh Ministerial Conference “Environment for Europe”. The presentation included information on the preparation process of the Action Program in the Aral Sea basin for the period 2011-2015 (ASBP-3).

The working meeting of the EC IFAS with representatives of the international and donor organizations took place in Almaty on the 17th of March. 

The working meeting of the EC IFAS member-States representatives and experts from the European Commission project took place in the office of the EC IFAS. The meeting participants have got an opportunity to introduce the new EC IFAS staff member – technical director Alfred Diebold, and the international expert from European Commission Anatoliy Krutov.

On the 3rd March in the office of the UN Regional Centre for Preventive Diplomacy in Central Asia in Ashgabat the Memorandum of understanding between the United Nations and the Executive Committee of the International Fund for saving the Aral Sea (EC IFAS) has been signed.

The national consultations within the framework of the Aral Sea Basin programme elaboration (ASBP-3 for the period of 2011-2015) took place on the 2nd of March in the Republic of Uzbekistan. The meeting was held in the Ministry of agriculture and water resources.

The national consultations within the framework of the Aral Sea Basin programme elaboration (ASBP-3 for the period of 2011-2015) took place on the 2nd of March in Turkmenistan.

Homepage | About EC IFAS | Themes | ASB Program | EC IFAS branches
Press | Photo gallery | Films | Site map | Contacts | Disclaimer